Skip to the quote form

Party wall drawings in London: the plans and sections that go with a notice

A party wall notice reaches a neighbour who has not seen your plans, so the drawings have to explain the work alone. Drawings4Planning draws the plans and sections, and we prepare the notice from £39 per adjoining owner, no VAT to add; the notice itself is written up in full on our sister site.

  • Party wall notice from £39 per adjoining owner
  • Builders’ drawing review £269 fixed, no VAT to add
  • MCIAT chartered technologists · £2m professional indemnity

Tell us about the house, get a fixed fee

Your fixed fee arrives here.

Only if you would rather talk it through.

We use it to see what applies there: listing, conservation area, trees and so on.

Briefly: what you would like built, and what the planning officer has said, if anything.

Optional. Accepted: DWG, HEIC, JPG, PNG or PDF, up to 10 files and 28 MB combined.

Enquiries in by 3pm are answered that same working day.

Your details are used only to respond to this enquiry. See our privacy notice.

Would you rather use WhatsApp? Message us here

What are party wall drawings?

Under the Party Wall etc. Act 1996, an owner who plans certain work on or beside a shared wall, or a dig near a neighbour’s foundations, gives the adjoining owner a written notice. Party wall drawings are the plans and sections that go with it, showing the shared wall, the new work and the 3 m and 6 m lines, so that owner can see the proposal.

Two houses, one wall

In the model: Two houses of the terrace take a tint each, and a dashed line runs up the wall they share.

Three metres

In the model: A zone reaches 3 m from the neighbouring house, above a line marking the base of its foundations. Section 6 of the Act covers a dig inside the zone that goes deeper than that line.

Six metres

In the model: A second zone reaches 6 m. Here a plane sloping down at 45° from the base of the neighbour’s foundations decides whether a deeper dig falls under section 6.

Review clouds

In the model: The view moves to a drawing sheet, where red clouds circle the points a builder’s drawing review marks for correction.

The notice drawings: what the neighbour reads

The person who reads a party wall notice has not seen your plans, so the drawing has to carry the explanation alone. It shows the shared wall or boundary, the new work drawn against the neighbouring house, and, for a dig, a section setting the excavation depth against the base of the neighbour’s foundations.

For a notice of adjacent excavation, the Act asks for plans and sections showing the site and depth of the excavation and the site of any building or structure to be erected, so those sheets are required, not optional extras. The notice itself is a separate job, priced per adjoining owner and written up on our sister site (below). The fixed fee we confirm names the drawings it covers.

Which notice, how far ahead, and which drawings?

Three notices matter for most house projects, and each has its own minimum period under the Party Wall etc. Act 1996, counted back from the day the work is due to start:

  • Line of junction (section 1): at least one month ahead, for a new wall on the line of junction or wholly on your own land beside it. The notice describes the intended wall; the Act asks for no drawings with it.
  • Party structure (section 3): at least two months ahead, for work such as cutting into or raising a shared wall. The notice states the nature and particulars of the work; plans, sections and construction details are required only where special foundations are proposed, with particulars of the loads they carry.
  • Adjacent excavation (section 6): at least one month ahead, with plans and sections showing the site and depth of the excavation and the site of any building or structure to be erected.

Where the 3 m and 6 m zones come from

Section 6 of the Act deals with digging near a neighbouring building or structure. It applies to an excavation within 3 m, measured horizontally from any part of that building or structure, that goes deeper than the bottom of its foundations. It also applies to one within 6 m that cuts a plane sloping down at 45° from the base of those foundations.

Drawing the zones on a plan and section lets everyone see quickly whether a proposal falls inside them. Which rules apply depends on your design, and our drawings show the dimensions rather than decide the legal question.

Notice, planning and building control are separate

A party wall notice is a different process from planning permission and building control approval, so holding one does not replace another. The council reads the planning sheets, the building control body reads the technical sheets, and the adjoining owner reads the notice sheets.

Timing needs planning too. After building control approval, our next-steps pack sets out the party wall timing beside the commencement notice and any Community Infrastructure Levy charge.

The notice and the homeowner’s drawing review are written up on our sister sites

Serving the notice, and working out who the adjoining owners are, is covered in full on our sister site DrawingsDirect; our fee for the notice stays £39 per adjoining owner if you order through us. A second opinion on drawings someone else prepared for your home is covered on Property Architecture.

For a builder who needs to know whether a set is ready to price and build from, our own construction drawing review is £269 fixed, no VAT to add.

How the party wall drawings work

  1. Tell us the work and the neighbours

    Say what is planned and which properties adjoin it.

  2. The sheets are drawn

    Plans and sections show the shared wall or boundary, the new work and any excavation depth against the neighbour’s foundations.

  3. The 3 m and 6 m lines are marked

    The zones are drawn so the dimensions are visible, and the legal question stays with the Act.

  4. Timing is set out

    Our next-steps pack gives the party wall timing next to the commencement notice and any CIL charge.

What the notice and the builders’ review cost

What the notice and the builders’ review cost
Party wall notice (per adjoining owner), written up on DrawingsDirect£39
Construction drawing review for builders£269

Both fees are no VAT to add. The notice is a starting price counted for each adjoining owner, and the builders’ review is fixed. The fixed fee we confirm for the drawings names exactly what it covers.

See every fee on one page

Sample sheets: a notice plan and a builders’ review markup

Two samples for an illustrative pair of terrace houses, not client work. The notice plan shows the party wall, the new work and the 3 m and 6 m lines against the neighbour’s foundations. The review sheet shows a set returned from our construction drawing review for builders, with red clouds and notes at each query.

Sample party wall notice drawing for a pair of terrace houses, with the shared wall as a dashed line, the proposed rear extension, and 3 metre and 6 metre zones drawn around the neighbouring house
Sample drawing
Sample floor plan returned from a construction drawing review for builders, with red clouds circling queries and short notes beside each one
Sample drawing
Rear of brick terrace houses at dusk, with slate roofs, chimney stacks, television aerials, a gabled rear wing and leafy shrubs in front
Closely packed tiled and slate roofs with grey chimney stacks, a roof window and solar panels under an overcast sky
Hands resting on printed drawings on a white table: a floor plan with dimension lines on a dark sheet, a rendered picture of a brick building and a spiral notebook
Long row of Victorian brick terrace houses with stone bay windows, tall sash windows and black railings, seen at an angle

Questions about party wall drawings

Which drawings go with a party wall notice?

It depends on the notice. A notice of adjacent excavation under section 6 comes with plans and sections showing the site and depth of the excavation and the site of any building or structure to be erected. A line of junction notice under section 1 needs no drawings, and a party structure notice under section 3 needs them only where special foundations are proposed.

Sources: Party Wall etc. Act 1996, section 6 · Party Wall etc. Act 1996, section 3

What are the 3 m and 6 m lines on a party wall drawing?

They show the distances in section 6. A dig within 3 m of a neighbouring building that goes deeper than the bottom of its foundations falls under the Act, as does one within 6 m that cuts a plane sloping down at 45° from the base of those foundations. Our drawings show the dimensions; they do not decide the legal question.

Source: Party Wall etc. Act 1996, section 6

Do party wall drawings replace the planning or building control drawings?

No. A party wall notice is a different process from planning permission and building control approval. The council reads the planning sheets, the building control body reads the technical sheets, and the adjoining owner reads the notice sheets.

Source: Party Wall etc. Act 1996

Who writes up the party wall notice itself?

Our sister site DrawingsDirect covers the notice in full; through us it is from £39 per adjoining owner, no VAT to add. This page covers the drawings that go with it, and the fixed fee we confirm names which sheets it includes.

Is there a review for drawings a builder is about to price?

Yes. Our construction drawing review for builders is £269 fixed, no VAT to add, and marks each gap or clash on the sheet in red. A homeowner who wants a second opinion on drawings prepared elsewhere is better served by our sister site Property Architecture.

Tell us about the work and the neighbours

Send your postcode, a few lines on the work and how many neighbours adjoin it. We send a fixed fee, and if you write before 3pm on a working day, we reply that day.