Skip to the quote form
The back of a semi-detached house with a single-storey rear extension being built in grey blockwork, scaffolding and bricks on the lawn

Structural calculations for a London extension or loft, £379 fixed

Every time you knock through a wall, someone has to show what holds the house up afterwards. We size the steel, the lintels and the foundations, and issue the calculations building control asks for: £379.

  • £379 fixed, no survey fee
  • Beams, lintels and foundations sized
  • Free redraws until approval

Tell us about the house, get a fixed fee

Your fixed fee arrives here.

Only if you would rather talk it through.

We use it to see what applies there: listing, conservation area, trees and so on.

Briefly: what you would like built, and what the planning officer has said, if anything.

Optional. Accepted: DWG, HEIC, JPG, PNG or PDF, up to 10 files and 28 MB combined.

Enquiries in by 3pm are answered that same working day.

Your details are used only to respond to this enquiry. See our privacy notice.

Would you rather use WhatsApp? Message us here

What do structural calculations cost?

The fee is £379, with no survey fee and no VAT to add. It buys the calculations for the main structural elements of one project and the beam and foundation details that go on the building regulations drawings. Where an engineer’s site visit or a ground investigation is needed, we say so at the quote.

What the £379 covers

  • A review of the existing structure from our survey and the design, to find what carries what
  • Calculations for the new beams, lintels, padstones and any needle or temporary support the opening needs
  • Foundation sizing for the new extension, with notes where the ground needs investigating
  • Structural details and a beam schedule, in a form your builder can price from
  • Issue to building control, replies to the surveyor and free changes until approval
From opening to calculation
From opening to calculation: Existing, then Loads, then Sizing, then Details, then IssueExistingWhat carries whatLoadsRoof, floor, wallsSizingBeams andfoundationsDetailsSchedule andsketchesIssueTo building control

Why building control wants calculations

Because the Regulations do not accept “it looks big enough”. Part A requires a building to carry its loads to the ground safely, withstand ground movement and avoid disproportionate collapse (Schedule 1). A calculation is how you show a surveyor that a steel beam, a lintel or a foundation does that.

Taking out a chimney breast, opening a rear wall, forming a loft floor and adding a storey all change the path of the loads. In each case the calculation comes before the steel is ordered, not after.

What we calculate on a typical job

For a rear extension, the big beam over the opening, the padstones that bear it, the lintels over new windows and the foundation depth. For a loft, the new floor joists, the steel at the ridge or the party walls, and the support to the stair. For a basement or a side return, the retaining walls and underpinning, which is a bigger brief and we quote it.

  • Steel beams and padstones over new openings
  • Lintels over windows and doors
  • Foundation widths and depths for new walls
  • Loft floor joists and steel at ridge and walls

Structure, party walls and the ground

New foundations near a neighbour’s can bring the Party Wall etc. Act into play: excavation within 3 m that goes below the neighbour’s foundations needs notice at least a month before work begins (section 6). We prepare the notices as party wall notices.

The calculations sit with the building regulations drawings, and they are sized from the same survey. Our complete package holds all three in one fee range.

What the Building Regulations require of structure

A1
The building must carry the combined dead, imposed and wind loads safely and transmit them to the ground without damaging other buildings. Building Regulations 2010, Schedule 1, Part A
A2
It must be built so that ground movement from swelling, shrinkage, freezing, landslip or subsidence, as far as can be reasonably foreseen, will not impair its stability. Building Regulations 2010, Schedule 1, Part A
A3
If an accident occurs, the building must not collapse to an extent disproportionate to the cause. Building Regulations 2010, Schedule 1, Part A
Approved Document A
The statutory guidance covers the loads on a building and the construction of its foundations, walls, floors, roofs and chimneys. gov.uk, Structure: Approved Document A
5 weeks
A full-plans building regulations application is decided within 5 weeks, or 2 months by agreement. gov.uk, Building regulations approval: how to apply
3 m
Excavation within 3 m of a neighbour’s building that goes below the bottom of its foundations needs party wall notice. Party Wall etc. Act 1996, s.6(1)
1 month
That notice must be served at least one month before the digging starts. Party Wall etc. Act 1996, s.6(5)

Structural calculation questions

Do I need structural calculations for a rear extension?

Almost always, if you are removing a load-bearing wall or building new foundations. Building control asks for them with the application.

Source: Building Regulations 2010, Schedule 1, Part A

Is the £379 a chartered engineer’s fee?

It is our fee for the calculations and details for one project. If a project needs an engineer’s site visit or a ground investigation, we quote it before work starts.

Will the builder price from them?

Yes. The beam schedule and details are written so a builder can order steel and price the work.

How long does building control take?

A full-plans application is decided in 5 weeks, or 2 months by agreement.

Source: gov.uk, Building regulations approval: how to apply

What if my neighbours object to the foundations?

Digging below their foundations within 3 m needs notice under the Party Wall etc. Act, and we draw up the notices.

Source: Party Wall etc. Act 1996, s.6

Knocking through? Size the steel first.

Send the address and a sketch of the opening. We reply with a fixed fee.