Skip to the quote form
A red-brick house with a slate roof and roof windows, a low glazed extension on its garden side and a striped lawn in front

Lawful Development Certificate drawings, £539 in total

If your extension or loft can go ahead without planning permission, a certificate is the council’s own written confirmation of it. We survey the house, draw the works to the permitted limits and submit the application: £389 plus the £150 survey.

  • £389 drawings + £150 survey (£539 total)
  • Submitted for you
  • Free redraws until approval

Tell us about the house, get a fixed fee

Your fixed fee arrives here.

Only if you would rather talk it through.

We use it to see what applies there: listing, conservation area, trees and so on.

Briefly: what you would like built, and what the planning officer has said, if anything.

Optional. Accepted: DWG, HEIC, JPG, PNG or PDF, up to 10 files and 28 MB combined.

Enquiries in by 3pm are answered that same working day.

Your details are used only to respond to this enquiry. See our privacy notice.

Would you rather use WhatsApp? Message us here

What is a Lawful Development Certificate?

It is a document from your council stating that the work you propose is lawful, meaning it needs no planning permission. It is not a permission, and it is optional, but it protects you when you sell. Our price is £389 plus a £150 measured survey, £539 in total with no VAT to add, and the council’s own application fee is separate.

Inside the £539

  • A measured survey of the house, roof and boundaries, done in person
  • Existing and proposed plans and elevations, with each dimension tested against the permitted development limit that applies
  • A roof volume calculation where the work is a loft or dormer
  • Site plan and location plan with the red line
  • A written statement describing exactly what is proposed, which the council asks for
  • Submission to the council and replies to the officer, with free redraws until approval
How a certificate application runs
How a certificate application runs: Rights check, then Survey, then Drawings, then Application, then CertificateRights checkArticle 4,conditions,conservationSurveyMeasured on onedatumDrawingsTested against eachlimitApplicationFee paid to thecouncilCertificateOr reasons forrefusal

Why bother with a certificate if the work is already permitted?

Because permission-free is your own opinion until someone with authority agrees. A buyer’s solicitor will ask whether a loft or extension was lawful, and a certificate answers that in one sheet. Without it you may be asked for an indemnity policy or a price reduction.

There is a second reason. The council reads our drawings against the rules before it grants the certificate, so errors in your own reading of them, such as an eaves height over 3 m near the boundary, come out before you have paid a builder.

What does the council actually test?

Only whether the works meet the permitted development tests: it does not weigh your neighbours’ views or the design. Precision is what counts. The government guidance says an application must describe exactly what is proposed, and an officer may refuse if the information is vague (paragraphs 005 and 006). A refusal is not conclusive, though: it may only mean the evidence so far was thin, and you can reapply.

  • Is the house a dwellinghouse, not a flat or maisonette?
  • Has permitted development been removed by an Article 4 direction or an earlier planning condition?
  • Do depth, height, eaves and volume stay inside the limits in the Order?
  • Are the materials and side windows within the conditions in the Order?

When a certificate is the wrong tool

If the extension must be deeper than the permitted 3 m or 4 m, a certificate cannot help; see prior approval for a larger home extension for up to 6 m or 8 m, or a householder planning application for more. In a conservation area many rights disappear, and the better route is usually planning permission. Our planning permission guide shows how to choose.

For a loft, read loft conversion drawings, since the volume test is the one that most often decides whether a certificate is possible.

The certificate in figures and clauses

s.192
A certificate for proposed works is granted under section 192 of the Town and Country Planning Act 1990. gov.uk, Lawful development certificates, paragraph 001
Presumed lawful
Once granted, development carried out in accordance with the certificate must be presumed lawful unless there is a material change before it begins. gov.uk, Lawful development certificates, paragraph 002
Article 4
A direction under article 4 that removes the right you relied on is one of the examples of a material change that can undo a certificate before work starts. gov.uk, Lawful development certificates, paragraph 002
3 m / 4 m
The usual single-storey rear extension depth under permitted development: 3 m for terraced and semi-detached houses, 4 m for detached. GPDO 2015, Sch. 2 Part 1, Class A.1(f)
40 m³ / 50 m³
The volume a roof enlargement can add under Class B: 40 m³ on a terrace, 50 m³ otherwise. GPDO 2015, Class B.1(d)
Half the fee
For a proposed use or operation the application fee is half the full planning application fee. National fee schedule from 1 April 2026, published by Bradford Council
£548
The full householder planning fee from 1 April 2026, so a proposed-works certificate costs half of it, £274. National fee schedule from 1 April 2026, published by Bradford Council
Building Regs
A certificate says nothing about building regulations, which still apply to the work. gov.uk, Lawful development certificates, paragraph 003

Certificate questions

Is a Lawful Development Certificate compulsory?

No. Permitted development works can proceed without one. It is the council’s written confirmation, useful when you sell or refinance, and it fixes the position at the date it is granted.

Source: gov.uk, Lawful development certificates, paragraph 002

Does the certificate cover building regulations?

No. It deals only with planning law, so the Building Regulations 2010 and the Party Wall etc. Act 1996 still apply to the work. We price those separately.

Source: gov.uk, Lawful development certificates, paragraph 003

What is the council fee for the certificate?

For proposed works it is half the householder application fee, which is £274 when the full fee is £548. It is paid to the council, not to us.

Source: National fee schedule from 1 April 2026

Can I apply for a certificate for work I have already built?

Yes, that is a certificate for an existing use or operation, and its fee is the same as the full application fee. It needs evidence that the work was permitted when it was built, or that it has been in place long enough. Tell us what you have and we advise on the route.

Source: National fee schedule from 1 April 2026

What happens if the council refuses?

The refusal states the reason. If a drawing change can answer it, we redraw at no charge and reapply, because free redraws until approval cover this service.

Check that your plans really are permitted

Send the address and a few words on what you want to build. We check the house for Article 4 and conditions, then reply with a fixed fee.