Skip to the quote form
Glazed double doors in a new blockwork rear extension with scaffold tower and a wheelbarrow on the unfinished floor

Builder’s and construction reports, from £199

A build goes wrong in the gaps: a drawing nobody checked, a quote that left out the drains, a defect found after the last payment. Each report below closes one gap, with its fee published and no VAT to add.

Tell us about the house, get a fixed fee

Your fixed fee arrives here.

Only if you would rather talk it through.

We use it to see what applies there: listing, conservation area, trees and so on.

Briefly: what you would like built, and what the planning officer has said, if anything.

Optional. Accepted: DWG, HEIC, JPG, PNG or PDF, up to 10 files and 28 MB combined.

Enquiries in by 3pm are answered that same working day.

Your details are used only to respond to this enquiry. See our privacy notice.

Would you rather use WhatsApp? Message us here

What are builder’s and construction reports?

They are short written documents that answer one question about a building job: is the drawing buildable, which quote covers the whole scope, what exactly is to be built, and is it built as agreed. Fees run from £199, each is fixed or a published “from” price on its own page, and there is no VAT to add. Pick the report for your stage, or start with the drawing review if you are unsure.

Reports and prices

Structural calculations, engineering design and formal inspections are provided only through an appointed professional, such as a structural engineer or a building control surveyor. These reports do not replace them: where a report finds something that needs one, it says so and names the kind of professional to appoint.

Which report do I need at which stage of the build?

Match the report to the next decision you have to make, not to the whole project. Most jobs need one or two reports, rarely all of them.

  • Before anyone prices: a construction drawing review for builders checks the set for gaps and conflicts, and construction detail drawings or a schedule of works and specification fill in what the set leaves open.
  • Choosing a builder: a builder quote comparison puts the quotes side by side on scope, and a tender package lets several builders price one identical set.
  • During the work: a construction management plan sets out deliveries, hours, parking and neighbours, which councils often ask for as a condition.
  • Before the final payment: a snagging report lists what is unfinished or wrong, so you can hold the last invoice against a written list.
The back of a semi-detached house with a single-storey rear extension being built in grey blockwork, scaffolding and bricks on the lawn
A single-storey rear extension part built: the point where a snagging list or a detail drawing earns its fee.

How do the reports hand on to each other?

Each report produces a document the next one can use. A drawing review lists the gaps. The detail drawings and schedule of works close them. The schedule then becomes the list every builder prices from, which is what the quote comparison and the tender package check against. The same schedule is what the snagging report measures the finished work against.

So buying them in order saves repetition: we do not re-measure or re-read the job for each one, and a later report starts from the earlier one. You can also buy any single report on its own and bring your own drawings or quotes.

A single-storey rear extension in grey blockwork under construction, with a steel beam spanning the new opening into the house
A rear extension with the steel opening formed: the detail drawings and engineer’s calculations have to agree before this stage.

What is a report, and what is it not?

These are documents written by chartered architectural technologists (MCIAT). A quote comparison is a check that quotes cover the same scope, not a quantity surveyor’s valuation. A snagging report is a visual check of the finished work, not a building control inspection and not a RICS survey. Construction details show build-ups and junctions; beams, foundations and other structure come from an engineer’s calculations.

Where a report finds something that needs a structural engineer or a building control surveyor, it says so and names who to appoint. We can arrange structural calculations as a separate service.

Who is responsible for safety on the job?

On a domestic job the client’s legal duties usually pass to the contractor, or to the principal contractor if there is more than one (HSE). A construction management plan helps you set out site arrangements, but it does not replace the contractor’s own duties.

If the work also needs building regulations approval, the council or an approved inspector decides a full plans application within 5 weeks, or 2 months with your consent (gov.uk). Reports that describe the build, such as the schedule of works, are most useful when they are ready before that application goes in.

The back of a semi-detached house with a new blockwork extension rising beside it

What do we need from you?

Tell us the address and which report you want. Then send what exists: the drawings, the specification, the quotes, or access for a visit. If you have nothing yet, say so. We reply with the fee and a list of anything else we need, before you pay.

A report starts from what you give us. If a drawing is missing a dimension we cannot invent it, so the report will list it as a question for the designer or the builder instead.

Builder’s and construction report questions

Which report should a homeowner buy first?

If you have drawings but no builder yet, start with the construction drawing review. If you already hold quotes, the builder quote comparison, from £199, tells you whether they price the same job.

Can a small builder use these reports to price a job?

Yes. The schedule of works and the detail drawings give a builder the quantities of work and the junctions to price from. They are written for the person who will build, in plain English.

Do the reports replace a structural engineer?

No. Structural calculations and engineering design come only through an appointed professional. Our reports say where one is needed.

Are the fees fixed, and is VAT added?

Each report has one published fee on its page, either fixed or marked “from” with what moves it. There is no VAT to add.

How is a snagging report different from building control?

A snagging report is a visual check against the agreed work, written for you. Building control inspects for compliance with the building regulations. A snagging report does not replace that inspection.

Tell us where your build is

Send the address and the stage you are at. We reply with the right report and its fixed fee.