How much do building regs drawings cost in London?

Building regulations drawings from us cost £629 in total: £479 for the technical set and £150 for the measured survey, with no VAT to add. If we have already surveyed your house for planning drawings, the survey is not charged again and the set is £479.

From £629 with the survey

Tell us about the house, get a fixed fee

Your fixed fee arrives here.

Only if you would rather talk it through.

We use it to see what applies there: listing, conservation area, trees and so on.

Briefly: what you would like built, and what the planning officer has said, if anything.

Optional. Accepted: DWG, HEIC, JPG, PNG or PDF, up to 10 files and 28 MB combined.

Enquiries in by 3pm are answered that same working day.

Your details are used only to respond to this enquiry. See our privacy notice.

Would you rather use WhatsApp? Message us here

Written by
The Drawings4Planning technical teamChartered architectural technologists (MCIAT)
Published
Updated
Reading time
3 min
Topic
Building regulations

A brick house under construction with a wide new opening in the rear wall spanned by a steel beam. Photo: Brett Jordan, Pexels License.

What is the £629 for?

It pays for the drawings that show how the building is made, rather than how it looks. After a measured survey, we draw foundations, wall and roof build-ups, the steel opening, floor and stair details, drainage and fire escape, with notes that tell the building control officer which standard each item meets. The builder works from the same sheets.

The fee is fixed, and the survey sits inside it. When you have already paid us for the survey during your planning job, the second set drops to £479, because we do not measure the same house twice.

Planning set and building regulations set for the same house
Planning drawings and submission paid to us£479
Building regulations drawings paid to us£479
One measured survey, charged once paid to us£150
Total£1,108

Total £1,108 to Drawings4Planning, not £1,258: the £150 survey is charged once per property visit.

What does building control charge on top?

Its own fee, paid to it. The government explains that local authorities base their fees on their costs, and that the amount depends on the type of work, the site inspections, the number of dwellings and the floor area for extensions (gov.uk). A private registered approver negotiates the fee directly with you.

We do not set that fee and cannot predict it, so ask the council or approver for a written charge before you choose. Getting two quotes for it is sensible.

Do you need the drawings before building starts?

For anything beyond a small job, yes. A full-plans application is approved before work begins and you can expect a decision within 5 weeks, or 2 months with your consent. A building notice lets work start 2 days after it is submitted, but gives no formal approval and suits only smaller projects (gov.uk).

Once the work is finished, the usual completion certificate arrives within 8 weeks, as long as it complies.

Glazed double doors in a new blockwork rear extension with scaffold tower and a wheelbarrow on the unfinished floor
Glazed double doors fitted in a blockwork rear extension, with a scaffold tower inside. Photo: Brett Jordan, Pexels License.

What else belongs in the budget?

A structural engineer when beams or foundations need calculations: our structural calculations service starts at £379, and the engineer’s sizes appear on the drawings. If the work touches a shared wall, a party structure notice goes out at least two months before the work starts (s.3); ours begin at £39 per adjoining owner.

Last, the building regulations themselves have many parts, from structure to fire safety and energy (Approved Documents). The drawing set shows which part each detail satisfies, so the officer is not left to work it out.

Where the figures come from

5 weeks
Expected decision time for a full-plans building regulations application, or 2 months with consent. gov.uk, How to apply for building regulations approval
2 days
A building notice lets work start 2 days after submission, without formal approval. gov.uk, How to apply for building regulations approval
8 weeks
Usual wait for a completion certificate after the work is finished, if it complies. gov.uk, How to apply for building regulations approval
By cost
Local authorities base building control fees on their costs. gov.uk, How to apply for building regulations approval
Negotiated
Private registered approvers agree their fees directly with you. gov.uk, How to apply for building regulations approval
2 months
Minimum notice before work starts under a party structure notice. Party Wall etc. Act 1996, s.3

Building regs cost questions

Can I use the planning drawings for building regulations?

Not on their own. Planning drawings show the council the finished size and look; building control needs construction detail such as beams, insulation and drainage. We build the second set from the same survey.

Do I choose the council or a private approver?

You may use either. The council’s building control team or a private registered approver can check the work, and their fees differ, so compare written quotes.

Source: gov.uk, Building regulations approval

Is it cheaper to order planning and building regulations together?

Yes, by the survey. Together they are £1,108 to us; ordered separately without sharing the visit they would be £1,258.

What if the work is already built?

Regularisation is a separate route for work done without consent, and is priced as its own service.

Full details of the service: Building regulations drawings.

Price your building regulations set

Send your postcode and what you are building. We confirm £629, or £479 if we have surveyed the house for you before, and tell you what to ask building control for.

What £629 gets you

  • A measured survey, or reuse of your earlier planning survey
  • Construction plans, sections and structural layout
  • Drainage, insulation, stair and fire escape details
  • A notes schedule tied to the Approved Documents
  • Free redraws until approval