How much does a tender package cost in London?

A tender package from us costs £899 fixed, with no survey fee and no VAT to add. It turns your approved design into construction drawings and a written specification that several builders can price like for like.

From £899 no VAT to add

Tell us about the house, get a fixed fee

Your fixed fee arrives here.

Only if you would rather talk it through.

We use it to see what applies there: listing, conservation area, trees and so on.

Briefly: what you would like built, and what the planning officer has said, if anything.

Optional. Accepted: DWG, HEIC, JPG, PNG or PDF, up to 10 files and 28 MB combined.

Enquiries in by 3pm are answered that same working day.

Your details are used only to respond to this enquiry. See our privacy notice.

Would you rather use WhatsApp? Message us here

Written by
The Drawings4Planning technical teamChartered architectural technologists (MCIAT)
Published
Updated
Reading time
3 min
Topic
Building regulations

Yellow crane lifting precast concrete floor slabs from a lorry on a building site, a steel frame behind. Photo: Peikko, Public domain.

What is in the £899?

Three things a builder needs and a planning set does not give. Construction drawings with the dimensions and details that the builder works from, a written specification for materials and workmanship, and a priced schedule that each builder fills in, so the quotes arrive in one comparable form.

Without them, three builders price three different houses: one allows for the steel and one does not, one assumes cheaper windows. With them, the differences you see are real differences in price.

Tender package
Construction drawings, specification and pricing schedule paid to us£899
Total£899

Total £899 to Drawings4Planning. Builders’ prices, building control and any engineer are separate.

Who is responsible for what on site?

The client has duties, even on a house. Regulation 11A of the Building Regulations 2010 requires a client to make suitable arrangements for planning, managing and monitoring a project (reg 11A). Where more than one contractor is or may be involved, the client must appoint a principal designer and a principal contractor in writing (reg 11D).

For a domestic client the HSE explains that the client duties normally pass to the contractor on a single-contractor project, or to the principal contractor where there are several (HSE). A clear tender pack makes those appointments easier to set out.

Is it separate from building regulations drawings?

Yes. Building regulations drawings (£479 when we hold the survey) are for building control, which usually decides a full-plans application within 5 weeks, or 2 months by agreement (gov.uk). The tender pack goes further into the detail a builder needs to price and build, and it uses the same dimensions.

Where we have drawn the planning and building regulations sets, the tender pack builds on them. Where someone else drew them, we check the drawings first and say if anything needs to be corrected.

Glazed double doors in a new blockwork rear extension with scaffold tower and a wheelbarrow on the unfinished floor
Glazed double doors in a blockwork rear extension, with a scaffold tower and a wheelbarrow on the unfinished floor. Photo: Brett Jordan, Pexels License.

Is it worth it for a small job?

For a single-storey rear extension with one builder you trust, probably not. For a project with structure, several trades or a budget you cannot afford to get wrong, such as a basement, a double-storey extension or a loft with a steel frame, it usually is.

The test is simple: if you are asking more than one builder for a price, give them all the same documents. That is what £899 buys.

Where the figures come from

Client duty
A client must make suitable arrangements for planning, managing and monitoring a project. Building Regulations 2010, regulation 11A
In writing
Where more than one contractor is involved, the client must appoint a principal designer and a principal contractor in writing. Building Regulations 2010, regulation 11D
Single contractor
On a single-contractor project the domestic client duties normally pass to the contractor. HSE, CDM 2015: domestic clients
Several contractors
With several contractors the duties normally pass to the principal contractor. HSE, CDM 2015: domestic clients
5 weeks
Decision time for a full-plans building regulations application, or 2 months by agreement. gov.uk, How to apply for building regulations approval

Tender package cost questions

Do I need a tender package if I have a builder already?

Not for tendering, but the same documents still protect a single-builder job, because a specification fixes what the price includes. Some owners choose the lighter building regulations set for that.

How many builders should I send it to?

Three is common. We do not choose them for you, but the schedule is built so that three quotes compare line by line.

Does the pack include the builder’s price?

No. The pack is what builders price from. Their prices come back to you, and we can help you compare them on request.

Do I need a principal designer?

When more than one contractor is or may be involved, the regulations require the client to appoint one in writing. Tell us your plan for contractors and we explain how it applies.

Source: Building Regulations 2010, regulation 11D

Full details of the service: Tender package.

Get three comparable builders’ prices

Send your drawings or tell us what you are building. We confirm the £899 and what the pack will contain.

What £899 gets you

  • Construction drawings with the details a builder works from
  • A written specification of materials and workmanship
  • A pricing schedule for each builder to complete
  • A check of your planning and building regulations drawings
  • A fixed fee before we start